Project 20KJ0128

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20KJ0128","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF USUGAN RIVER FLOOD CONTROL PROJECT (DOWNSTREAM), PACKAGE B, BONIFACIO, MISAMIS OCCIDENTAL","Flood Control and Drainage","Completed",91674996.05,0,100,"Misamis Occidental 2nd DEO","Region X","MINDANAO ROCK (23479)","2020-11-27","2022-04-04",2020,"Regular Infra - GAA 2020 OO-2",8.01847,123.6548,"1004203000","1004200000"]