Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20KK0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20KK0010","CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG DANGOAN RIVER, BRGY. BULUA, MEDINA, MISAMIS ORIENTAL (PHASE 2)","Flood Control and Drainage","Completed",29395933.79,0,100,"Misamis Oriental 1st DEO","Region X","ONE NINE ONE TRADING (44468)","2020-11-19","2021-04-29",2020,"Regular Infra - GAA 2020 OO-2",8.9131,125.01017,"1004319000","1004300000"]
SHA-256
76f3d6bc5adfe74e23deb8e5deac83721395f3d276e9df304e0b3faec9c9bae2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.