Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20KK0104

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20KK0104","CONSTRUCTION OF FLOOD CONTROL UPSTREAM OF WATERFALL BRIDGE 2, BRGY. WATERFALL, BALINGASAG, MISAMIS ORIENTAL","Flood Control and Drainage","Completed",14848466.46,0,100,"Misamis Oriental 1st DEO","Region X","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2020-11-19","2021-02-28",2020,"Regular Infra - GAA 2020 LP",8.73309,124.78101,"1004302000","1004300000"]
SHA-256
5f35faf14cec99f530c5231a87230f417fd0f712a2737ebb5266bc4d02fd83ac

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.