Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20LB0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20LB0027","CONSTRUCTION OF REVETMENT ALONG MATINA RIVER, STA. 3+060 TO STA. 3+520, DAVAO CITY","Flood Control and Drainage","Completed",86136865,0,100,"Davao City DEO","Region XI","A.Y.U. ENGINEERING & CONSTRUCTION (25632) / ABU CONSTRUCTION (22313)","2020-12-13","2023-03-20",2020,"Regular Infra - GAA 2020 OO-2",7.06059,125.56923,"1130700000","1102400000"]
SHA-256
e76298c2a306c0a66c465f289c5f025efd8ca17d5c57e971b4544fd041387729

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.