Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20LB0326

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20LB0326","CONSTRUCTION OF 3STY-12CL SCHOOL BUILDING, BUHANGIN CES SPED CENTER, DAVAO CITY","Buildings and Facilities","Completed",37500000,0,100,"Davao City DEO","Region XI","O. G. SANTOS CONSTRUCTION (2050)","2020-10-18","2021-10-07",2020,"Outside Infra - GAA 2020 DepEd BEFF",7.10934,125.61224,"1130700000","1102400000"]
SHA-256
ccb6edf0b4c6ecf5516dc501ce7832c63ff52b903f1f3c1d64dc28731621e54a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.