Project 20LC0139
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20LC0139","CONSTRUCTION OF MULTI-LEVEL SCHOOL BUILDING, DAVAO DEL NORTE STATE COLLEGE, DATU JOSE LIBAYAO TALAINGOD CAMPUS, TALAINGOD, DAVAO DEL NORTE (IP ATA MANOBO TRIBE HIGHER EDUCATION SCHOOL)","Buildings and Facilities","Completed",19316811.6,0,100,"Davao del Norte DEO","Region XI","GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY) (36141)","2020-12-09","2021-06-30",2020,"Regular Infra - GAA 2020 LP",7.63194,125.56167,"1102322000","1102300000"]
SHA-256
ae82b3072c408882d39d6e319cd6cba9cf28d1ab81f37c3ab73c96963529f258Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.