Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20LD0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20LD0059","CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MATTI RIVER, BRGY. MATTI, DIGOS CITY, DAVAO DEL SUR","Flood Control and Drainage","Completed",49000000,0,100,"Davao del Sur DEO","Region XI","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2020-02-20","2020-10-23",2020,"Regular Infra - GAA 2020 OO-2",6.76759,125.30822,"1102403000","1102400000"]
SHA-256
f812b8abb1f0a6467f5ab346bb93afcd97ce41d2e060f5146b6c153caf8b4da7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.