Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20MF0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20MF0016","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE: CONSTRUCTION OF FLOOD CONTROL OF BANGA RIVER ALONG BIRD SANCTUARY, BARAS, TACURONG CITY, SULTAN KUDARAT","Flood Control and Drainage","Completed",46429259.01,0,100,"Sultan Kudarat 1st DEO","Region XII","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2020-02-27","2021-08-17",2020,"Regular Infra - GAA 2020 OO-2",6.62424,124.64137,"1206511000","1206500000"]
SHA-256
95b54cbe614aac99066b2e5b94bb42264c51255ed9f743f3dd65024ee7e75fa0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.