Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20MG0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20MG0048","RETROFITTING/STRENGTHENING OF BRIDGE-PALIAN BR. (TWIN BR. SB)) (B01518MN) ALONG MARBEL-MAKAR RD","Bridges","Completed",12246459.27,0,100,"South Cotabato 2nd DEO","Region XII","FFJJ CONSTRUCTION (16712)","2020-03-10","2020-07-27",2020,"Regular Infra - GAA 2020 OO-1",6.38909,124.90139,"1206306000","1206300000"]
SHA-256
fd2e135c2bf8ef4935e0391b56b5fcce56925a29095580d3d769d2ee17ff2c68

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.