Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20NG0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20NG0034","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. VILLAFLOR / BRGY. VILLAFLOR, GIGAQUIT, SURIGAO DEL NORTE","GAA 2020 OO-2","Completed",24499816.56,0,100,"Surigao del Norte 2nd DEO","Region XIII","JMT CONSTRUCTION CORPORATION (FORMERLY: JMT CONSTRUCTION) (14186)","2020-12-10","2021-04-05",2020,"Regular Infra - GAA 2020 OO-2",9.5615,125.69715,"1606711000","1606700000"]
SHA-256
e18145119807e82d843015711c976d3d5477357abd6e2dac7dd5bc1c1102a03d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.