Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20NG0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20NG0062","CONSTRUCTION OF OMBONG FLOOD CONTROL / BRGY. OMBONG, ALEGRIA, SURIGAO DEL NORTE","Flood Control and Drainage","Completed",28141882.72,0,100,"Surigao del Norte 2nd DEO","Region XIII","AMALGO CONSTRUCTION (42423)","2020-12-10","2021-06-13",2020,"Regular Infra - GAA 2020 LP",9.46294,125.5934,"1606701000","1606700000"]
SHA-256
dcefcddca22cd9be5eb02c3373845ef01de14106141b02f810cf46bbd1005f03

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.