Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20NI0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20NI0015","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION ALONG POBLACION BISLIG RIVER, BISLIG CITY, SURIGAO DEL SUR","Flood Control and Drainage","Completed",29350742.15,0,100,"Surigao del Sur 2nd DEO","Region XIII","CONCEPCION BASIC BUILDERS INC. (5255)","2020-02-10","2020-12-23",2020,"Regular Infra - GAA 2020 OO-2",8.18806,126.3521,"1606803000","1606800000"]
SHA-256
c282ff81d44d3d044a322f273ea7bdd6194564494c47b797dda14d442c7aabb5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.