Project 20OB0438
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20OB0438","CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SENATE PRESIDENT NEPTALI A. GONZALES INTEGRATED SCHOOL, BRGY. MAUWAY, MANDALUYONG CITY","Buildings and Facilities","Completed",26181724.93,0,100,"Metro Manila 1st DEO","National Capital Region","TRACSOM BUILDERS, INC. (5935)","2020-09-01","2021-10-18",2020,"Outside Infra - GAA 2020 DepEd BEFF",14.5785,121.04283,"1380500000","1307400000"]
SHA-256
5430797ea104b22a4abe163e69664c7bf13cbc04c4567b7d015c8484b8834b87Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.