Project 20OE0010
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20OE0010","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT (STEEL SHEET PILE) ALONG SOUTH ANTIPOLO OPEN CANAL PH","Flood Control and Drainage","Completed",38618843.84,0,100,"North Manila DEO","National Capital Region","ALLEYWAY CONSTRUCTION (15310)","2020-02-12","2020-10-18",2020,"Regular Infra - GAA 2020 OO-2",14.62279,120.97647,"1380600000","1303900000"]
SHA-256
cf558ae9556f9ad74591848eb8e2d67667257fc8ef11d26ea59bfe80a9bef8a7Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.