Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20OF0006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20OF0006","CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND TRIBUTARIES,BRGY. BATASAN HILLS (PHASE 6), QUEZON CITY","Flood Control and Drainage","Completed",47285000,0,100,"Quezon City 1st DEO","National Capital Region","E.L. ANOLIN CONSTRUCTION (35406)","2020-02-07","2021-03-14",2020,"Regular Infra - GAA 2020 OO-2",14.65021,121.02821,"1381300000","1307400000"]
SHA-256
5ed4d1cd35a13733be786ad1c7149320701d4d80767a20efba11f27eae002fc1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.