Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20OI0096

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20OI0096","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAS PIÑAS RIVER (VERDANT) AND ITS TRIBUTARIES, LAS PIÑAS CITY","Flood Control and Drainage","Completed",29399910.36,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","MA-AN CONSTRUCTION CORP. (28751)","2020-10-05","2021-04-02",2020,"Regular Infra - GAA 2020 OO-2",14.45728,120.9825,"1380200000","1307600000"]
SHA-256
4d1b366fdf8c78643b7b264cd2f81b126ec03de18988b70c5c913d3d8aa0aedf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.