Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PB0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PB0015","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF KARAGAWAN RIVER (UPSTREAM) FLOOD CONTROL, BRGY. BADDUAT, KABUGAO, APAYAO","Flood Control and Drainage","Completed",18903751.05,0,100,"Apayao 1st DEO","Cordillera Administrative Region","PRIME MASTER CONST. AND DEV'T. CORP. (43456)","2020-02-10","2021-05-11",2020,"Regular Infra - GAA 2020 OO-2",17.98017,121.20399,"1408104000","1408100000"]
SHA-256
465ccd1cde0ceeef66d965af70f0ab2543408b45f9bfbb55c7d843c016cb9e71

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.