Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PE0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PE0049","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, COTCOT SECTION, KABAYAN, BENGUE","Flood Control and Drainage","Completed",60955190,0,100,"Benguet 1st DEO","Cordillera Administrative Region","ALMOND ENGINEERING & CONSTRUCTION (35225) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2020-09-21","2021-06-07",2020,"Regular Infra - GAA 2020 OO-2",16.62812,120.83945,"1401107000","1401100000"]
SHA-256
af3279f0ca828f4fd4280809290fc4994bcfcfc3cb64f34a31dc9230e9c73ca0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.