Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PF0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PF0028","CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS: CONSTRUCTION OF AMBALIDENG FLOOD CONTROL","Flood Control and Drainage","Completed",9789194.77,0,100,"Benguet 2nd DEO","Cordillera Administrative Region","DJY CONSTRUCTION (35651)","2020-09-20","2021-01-04",2020,"Regular Infra - GAA 2020 OO-2",16.70505,120.6702,"1401109000","1401100000"]
SHA-256
809dd37af460e92f88b00e8a4443bbfd5158f28490fd43ceeb1dfb483ecedca1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.