Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PI0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PI0048","CONSTRUCTION OF CHICO RIVER FLOOD CONTROL GAWA-TABRAK SECTION, TOCUCAN, BONTOC, MOUNTAIN PROVINCE","Flood Control and Drainage","Completed",14500000,0,100,"Mountain Province 1st DEO","Cordillera Administrative Region","KOMICHOV GENERAL CONSTRUCTION (42292)","2020-02-16","2020-07-31",2020,"Regular Infra - GAA 2020 OO-2",17.12482,121.03434,"1404408000","1404400000"]
SHA-256
2219fd1126781d222dd52e3da10ccaea58c2a5882fdc877672ce9e6663dbaf61

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.