Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20PK0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20PK0043","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF MALING FLOOD CONTROL, MALING, BALBALN, KALINGA","Flood Control and Drainage","Completed",9673045.64,0,100,"Upper Kalinga DEO","Cordillera Administrative Region","BHM CONSTRUCTION (30724)","2020-10-28","2021-06-01",2020,"Regular Infra - GAA 2020 OO-2",17.44003,121.20656,"1403201000","1403200000"]
SHA-256
f200e7962d9f55bd91aa7ec9ed06168792deebe2f92bd63eea4dc8ea5c3134ad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.