Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21AA0097

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21AA0097","CONSTRUCTION OF RIVER CONTROL SYSTEM, (PHASE 3 AND PHASE 4), BARANGAY TAGUIPORO, BANGUI, ILOCOS NORTE","Flood Control and Drainage","Completed",8819970.21,0,100,"Ilocos Norte 1st DEO","Region I","JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT (26983)","2021-08-18","2021-12-20",2021,"Regular Infra - GAA 2021 OO-2",18.51753,120.71203,"102804000","102800000"]
SHA-256
d1a5998bf7080fe1a109708c6f7c7b29ece3f39467c2825752b9138e06dc8207

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.