Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21AD0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21AD0029","CONSTRUCTION OF CABUGAO FLOOD CONTROL, SUYO, ILOCOS SUR","Flood Control and Drainage","Completed",9799946.61,0,100,"Ilocos Sur 2nd DEO","Region I","VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540)","2021-10-11","2022-12-01",2021,"Regular Infra - GAA 2021 LP",16.95917,120.49372,"102932000","102900000"]
SHA-256
f59c370b946b8e0780467bc0749ec6eb45fb1422c11e7cf70930c78a5f98c94a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.