Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21AJ0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21AJ0046","REHABILITATION/CONSTRUCTION OF PROTECTION WORKS ALONG SINUCALAN RIVER, BRGY. BANAOANG, STA. BARBARA, PANGASINAN","Flood Control and Drainage","Completed",47098773.3,0,100,"Pangasinan 4th DEO","Region I","KENWOOD CONSTRUCTION ENTERPRISES CORPORATION (FORMERLY:KENWOOD CONSTRUCTION ENTERPRISES) (22186)","2021-02-15","2021-08-09",2021,"Regular Infra - GAA 2021 OO-2",15.99619,120.42968,"105538000","105500000"]
SHA-256
d4ad3ef3d9ae675c8be79ad5a90392eb5933ef1207b780f5a2d59b552ece77b4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.