Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21BA0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21BA0015","CONSTRUCTION/REHABILITATION OF MAHATAO FLOOD CONTROL STA.0+000-STA.0+146, MAHATAO, BATANES","Flood Control and Drainage","Completed",15800000,0,100,"Batanes DEO","Region II","MOJR CONSTRUCTION AND DEVELOPMENT CORPORATION (38443)","2021-02-23","2021-11-08",2021,"Regular Infra - GAA 2021 OO-2",20.41448,121.94892,"200904000","200900000"]
SHA-256
df830a6bb4148ee46178dd71d14dce172623b19b640a967b1cd828f8ee9a4b13

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.