Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21BC0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21BC0059","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DUGO FLOOD CONTROL STRUCTURE ALONG RIVER, ABULUG, CAGAYAN STA. 10+310-STA. 10+490(R/","Flood Control and Drainage","Completed",49000000,0,100,"Cagayan 2nd DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2021-02-24","2022-01-12",2021,"Regular Infra - GAA 2021 OO-2",18.40924,121.4372,"201501000","201500000"]
SHA-256
ee130de4c524816c8e5798ce7a2af84125b747683d4042b8f24838b6294fc928

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.