Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21BI0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21BI0052","LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL     INFRASTRUCTURE PROGRAM-REPAIR/REHABILITATION/IMPROVEMENT OF FLOOD CONTROL AND   DRAINAGE STRUCTURE ALONG STA. CRUZ RIVER, SALINAS SECTION 2, BRGY. SALINAS, BAMBANG, NUE","Flood Control and Drainage","Completed",29700000,0,100,"Nueva Vizcaya DEO","Region II","SHANLEY CONSTRUCTION (35633)","2022-01-12","2022-10-12",2021,"Regular Infra - GAA 2021 LP",16.36743,121.03461,"205004000","205000000"]
SHA-256
45398b54707074941df792e531eed9836269c8dad114f5a3a67cbef804325c45

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.