Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21BJ0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21BJ0010","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SANTA CRUZ RIVER FLOOD CONTROL STRUCTURES, SAN FABIAN SECTION, KAYAPA, NUEVA VIZCAYA","Flood Control and Drainage","Completed",9799842.45,0,100,"Nueva Vizcaya 2nd DEO","Region II","BRG CONSTRUCTION (21931)","2021-02-12","2021-05-24",2021,"Regular Infra - GAA 2021 OO-2",16.33497,120.97652,"205010000","205000000"]
SHA-256
d5a21720259c47014225d8f96a86baf6e0c2821ce585985e54d88c2d6d38359f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.