Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21C00057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21C00057","FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONST. OF THE TARLAC CITY URBAN DRAINAGE SYSTEM ALONG MANILA NORTH ROAD, TARLAC CITY (PHASE I), PROVINCE OF TARLAC","Flood Control and Drainage","Completed",144750000,0,100,"Region III","Region III","NORTHERN BUILDERS (8789)","2021-04-21","2022-03-16",2021,"Regular Infra - GAA 2021 OO-2",15.47941,120.595,"306916000","306900000"]
SHA-256
c184389f7a79a2edf092889f75ae43fb09dfa3c80e274f75277a045849657abb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.