Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CC0193

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CC0193","CONSTRUICTION OF GUIGUINTO RIVER FLOOD CONTROL STRUCTURE AND ITS TRIBUTARIES AT TABANG, GUIGUINTO, BULACAN, STA. 00+750 - STA. 00+935","Flood Control and Drainage","Completed",24499959.6,0,100,"Bulacan 1st DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2022-01-11","2022-05-23",2021,"Regular Infra - GAA 2021 LP",14.83372,120.85891,"301410000","301400000"]
SHA-256
9fb3ad66985c8ce21e47cc85aab16138bfef78fa0ff3a44087ab35cb8dce1993

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.