Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CD0068

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CD0068","REHABILITATION / IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, STA. LUCIA SECTION, BRGY. STA. LUCIA, SAN MIGUEL, BULACAN PHASE III","Flood Control and Drainage","Completed",64847627.3,0,100,"Bulacan 2nd DEO","Region III","STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)","2021-03-24","2022-05-03",2021,"Regular Infra - GAA 2021 OO-2",15.07866,120.81571,"305405000","305400000"]
SHA-256
e68bbb13504b9210b21456739df30ad27e0425331df4984ba94b7672f702fad2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.