Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CD0176

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CD0176","CONSTRUCTION OF WATER DEFLECTOR RIVER WALL ALONG MARILAO RIVER FLOOD CONTROL STRUCTURES, MARILAO, BULACAN","Flood Control and Drainage","Completed",60079222.84,0,100,"Bulacan 2nd DEO","Region III","ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2022-03-10","2022-06-10",2021,"Regular Infra - GAA 2021 OO-2",14.75111,120.95244,"301411000","301400000"]
SHA-256
478f08b7799d42d449af335929ee25efd7a065d3540e6d7a816d0dca8d065777

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.