Project 21CH0022
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CH0022","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG GUMI RIVER, STA. 0+000-STA.0+116.26 (LEFT SIDE), STA. 0+010 - STA. 0+116.26 (RIGHT SIDE), BARANGAY STA. CATAL","Flood Control and Drainage","Completed",19591979.34,0,100,"Pampanga 2nd DEO","Region III","ARROW CONSTRUCTION (32834)","2021-04-05","2021-07-05",2021,"Regular Infra - GAA 2021 OO-2",14.91534,120.60436,"305408000","305400000"]
SHA-256
078d9521d35f075270111e45c42d1bf68a676edf25c0b781bb0c7be1f2c8a21cHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.