Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CH0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CH0038","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF SLOPE PROTECTION ALONG PORAC RIVER, CANGATBA SECTION, PORAC, PAMPANGA","Flood Control and Drainage","Completed",4982463.82,0,100,"Pampanga 2nd DEO","Region III","R.M. VITUG CONSTRUCTION (9227)","2022-03-07","2022-05-05",2021,"Regular Infra - GAA 2021 OO-2",15.07324,120.54273,"305415000","305400000"]
SHA-256
a09557550a8eca9d1531db0e72dfa076f6564c69283b5d468550b3f37f2fa045

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.