Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CI0039

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CI0039","LOCAL PROGRAM; CONST./REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, DRAINAGE/PROTECTION WORKS, CONST./REHAB OF DRAINAGES SYSTEM AT MAGALANG,PAMPANGA (PHASE 3)","Flood Control and Drainage","Completed",4786187.59,0,100,"Pampanga 3rd DEO","Region III","JOYNIELTIN CONSTRUCTION AND TRADING (41858)","2022-01-11","2022-03-11",2021,"Regular Infra - GAA 2021 LP",15.22007,120.6295,"305411000","305400000"]
SHA-256
63571a4c103fdf37c586e1aeb55a667050775cdb876157ba42040ac6d31fe346

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.