Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CJ0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CJ0003","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER (LEFT BANK), ANOLING 2ND - PAO 3RD SECTION (PACKAGE A), CAMIL","Flood Control and Drainage","Completed",48019995.67,0,100,"Tarlac DEO","Region III","ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)","2021-03-08","2021-06-30",2021,"Regular Infra - GAA 2021 OO-2",15.65713,120.40575,"306903000","306900000"]
SHA-256
274b78d8b314921df4cf2a459776ab2fe61745d130880c450e59bfe5e47867ab

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.