Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21CN0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21CN0005","CONSTRUCTION OF MALUPA-DIAN-AGUANG RIVER CONTROL, BALER, AURORA, LOCATION 1: 3+900 - STA. 4+050, LOCATION 2: STA.6+200 - STA. 6+326, LOCATION 3: STA. 8+800 - STA. 9+046.50, LOCATION 4: STA. 9+138 - STA. 9+185.50","Flood Control and Drainage","Completed",49000000,0,100,"Aurora DEO","Region III","IRC CONSTRUCTION & SUPPLIES (29943)","2021-07-12","2022-08-31",2021,"Regular Infra - GAA 2021 OO-2",15.76485,121.53575,"307701000","307700000"]
SHA-256
8c51fd91c2a584158c8d4543b8d8ba8dec59d0d1e2b571577568abe357b53d58

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.