Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21D00008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21D00008","PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS (PHASE II)","Flood Control and Drainage","Completed",144749597.33,0,100,"Region IV-A","Region IV-A","PHESCO, INCORPORATED (145)","2021-06-21","2023-03-03",2021,"Regular Infra - GAA 2021 OO-2",13.73913,121.05812,"401005000","401000000"]
SHA-256
2cb0957991fe17efbf57e399ef0da1a49213c5535e0513011a406b999f7c06ac

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.