Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21D00059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21D00059","FY 2021 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME1: ENSURE SAFE AND  RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONST.N OF MISSING LINKS/ NEW ROADS MSR JCT CANDA-HONDAGUA ROMA POINT -QUEZON ROAD, INCL. BRIDGE (QUEZON SIDE), QUEZON","GAA 2021 OO-1","Completed",270199361.75,0,100,"Region IV-A","Region IV-A","ADVANCED FOUNDATION CONSTRUCTION SYSTEMS CORP. (15449) / M.G. LUALHATI CONSTRUCTION CORP. (35373)","2021-02-18","2023-03-20",2021,"Regular Infra - GAA 2021 OO-1",13.99688,122.18188,"405637000","405600000"]
SHA-256
6275111a7a4fe67ccf09a7579b5238d4ee8aac833a23ae3a6fc0ce81e2d764e3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.