Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21D00079

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21D00079","PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MGMT. PROGRAM CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONST.N OF SLOPE PROTECTION, ROAD & OTHER IMPROVEMENTS ALONG RIVER IN MOLINO III & BRGY. MOLINO VI, BACOOR CITY, CAVITE","Flood Control and Drainage","Completed",244114309.46,0,100,"Region IV-A","Region IV-A","E. F. CHUA CONSTRUCTION, INC. (37826)","2021-12-03","2022-09-28",2021,"Regular Infra - GAA 2021 OO-2",14.39998,120.97854,"402103000","402100000"]
SHA-256
b1f1035b16de76d5ae12e69c8c43ab6da6fb9768c85dbf79e71e3b52203bfac7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.