Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DB0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DB0022","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA 0+000-STA 0+147 (UPSTREAM L/S), BALAYAN, BATANGAS","Flood Control and Drainage","Completed",23160000,0,100,"Batangas 1st DEO","Region IV-A","FRANDEL CONSTRUCTION AND DEVELOPMENT CORP. (36116)","2021-11-19","2022-02-16",2021,"Regular Infra - GAA 2021 OO-2",13.93557,120.72447,"401003000","401000000"]
SHA-256
a2ad6f38743f82924164686ab5c73bd21533afcc775ac306915a609aa0df1a5c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.