Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DB0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DB0121","1. EXTENSION OF MPB (BRGY. HALL) IN BRGY. ZONE 9, 2. CONSTRUCTION OF MPB (STAGE BLEACHER) IN BRGY. PANSOL COVERED COURT, BRGY. PANSOL, TAAL, BATANGAS","Buildings and Facilities","Completed",2000000,0,100,"Batangas 1st DEO","Region IV-A","TDR CONSTRUCTION & SUPPLY (8560)","2021-11-12","2021-12-15",2021,"Regular Infra - GAA 2021 LP",13.86474,120.93757,"401029000","401000000"]
SHA-256
8c644b4ec943fdab7372c18d4ab31a1aa2f903b54d7f8a21728f858141c472ce

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.