Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DE0055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DE0055","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALON","Flood Control and Drainage","Completed",91675000,0,100,"Batangas 2nd DEO","Region IV-A","VICMAR CONSTRUCTION, INC. (28997)","2021-02-11","2021-12-07",2021,"Regular Infra - GAA 2021 OO-2",13.75429,121.0642,"401005000","401000000"]
SHA-256
f08a118c47c5b22ee4004574f5eb511181c2e680cfb2f1332b71ace1507208e6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.