Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DK0152

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DK0152","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE A), PHASE 2","Flood Control and Drainage","Completed",37441984.4,0,100,"Quezon 1st DEO","Region IV-A","PREMIUM MEGASTRUCTURES INC. (36079)","2021-11-16","2022-05-24",2021,"Regular Infra - GAA 2021 OO-2",14.75132,121.63447,"405620000","405600000"]
SHA-256
599d6222e214a52d7309cfacd3f1d92b045752cd4e6aff7aeee7db131a8fb2e2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.