Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21DN0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21DN0035","CONSTRUCTION OF FLOOD CONTROL AND RIVERBANK PROTECTION STRUCTURES ALONG CAINTA RIVER, BRGY. STO. DOMINGO, CAINTA, RIZAL","Flood Control and Drainage","Completed",67549995.68,0,100,"Rizal 1st DEO","Region IV-A","A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265)","2021-02-26","2021-10-23",2021,"Regular Infra - GAA 2021 OO-2",14.59519,121.11603,"405805000","405800000"]
SHA-256
27eeb552eaa547f4edb0fe4d19e8aa1150b4dd13ce10b56fcb44f34c1a58a71e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.