Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21EA0055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21EA0055","CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF NANGKA II FLOOD CONTROL STRUCTURE ALONG MOGPOG RIVER, MOGPOG, MARINDUQUE","GAA 2021 OO-2","Completed",17813442.26,0,100,"Marinduque DEO","MIMAROPA Region","RPE CONSTRUCTION (45699)","2021-02-16","2021-10-11",2021,"Regular Infra - GAA 2021 OO-2",13.48206,121.84607,"1704004000","1704000000"]
SHA-256
9aa32279a5b981b504d4d2f22e0b662c1d2ed550b21028eaf41ddcd03d29e3db

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.