Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FA0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FA0038","CLUSTER 19-FLOOD MITIGATION/REHAB./EXTENSION OF RIVER CONTROL STRUCTURES AT MALOLOS RIVER AND SOA RIVER IN MALINAO, ALBAY","Flood Control and Drainage","Completed",29700000,0,100,"Albay 1st DEO","Region V","JORMAND CONSTRUCTION & SUPPLY (40760)","2022-04-19","2022-09-15",2021,"Regular Infra - GAA 2021 LP",13.38228,123.67728,"500510000","500500000"]
SHA-256
2d9ebe94a91371d0df94b09489a6f122703c3e8bbdec36dd81524128e9d4bbd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.