Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FB0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FB0080","LOCAL PROGRAM - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BAMBAN-PAWA-BALASBAS RIVER (BAMBAN SECTION), MANITO, ALBAY","Flood Control and Drainage","Completed",19798342.3,0,100,"Albay 2nd DEO","Region V","FIRST OMB CONSTRUCTION AND DEVELOPMENT CORP. (46481)","2021-03-05","2021-07-27",2021,"Regular Infra - GAA 2021 LP",13.11369,123.88328,"500511000","500500000"]
SHA-256
e6f75eb8cc7b2316b1e07c6d6f8a23b12410ef80a846ace9d1d7548dfe9162c8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.