Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FB0141

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FB0141","LIP-FLOOD CONTROL AND DRAINAGE: CONSTRUCTION OF RIVER BANK PROTECTION WORKS ALONG PAG-ASA-TAMAOYAN-YAWA RIVER, LEGAZPI CITY, ALBAY","GAA 2021 LP","On-Going",9898250.15,0,96.4,"Albay 2nd DEO","Region V","STEVEN CONSTRUCTION & SUPPLY (21987)","2021-10-30",null,2021,"Regular Infra - GAA 2021 LP",13.17261,123.74456,"500506000","500500000"]
SHA-256
b8db8fa0fc0feda4a58b61164e0f1d482340fadc785f7a283b07f9ace8bfc4fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.