Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FC0076

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FC0076","CONSTRUCTION OF MANDULUNGAN RIVER CONTROL STRUCTURE BARANGAY SITIO MANDULUNGAN - BARANGAY GUBAT, DAET, CAMARINES NORTE","Flood Control and Drainage","Completed",41883073.56,0,100,"Camarines Norte DEO","Region V","BRENTMIN ROOFING ENTERPRISE (37191) / N.E.B. CONSTRUCTION AND SUPPLY (42404)","2021-04-05","2021-09-15",2021,"Regular Infra - GAA 2021 OO-2",14.1211,122.97907,"501603000","501600000"]
SHA-256
1bac0837e76f1db6ec4ba025ca2c8d3da08e1a5ad078dfc6968ae8b65ab6a0c7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.